GSLV Mark-III

GSLV stands for Geosynchronous Satellite Launch Vehicle. GSLV Mk III is a 3 stage heavy lift launch vehicle developed by ISRO. This launch vehicle is designed for carrying heavier satellites. The below article shares details on the objectives of developing GSLV Mk III,  its successful launches, payload capacities & engines.

Aspirants would find this article very helpful while preparing for the IAS Exam.

GSLV Mk III – UPSC Notes:- Download PDF Here

Aspirants should begin their preparation by solving UPSC Previous Year Question Papers now!!

To complement your preparation for the upcoming exam, check the following links:

GSLV Mk III – Objective of Developing this Launch Vehicle

GSLV Mk -III  has higher thrust than the Polar Satellite Launch Vehicle (PSLV), the most successful launch vehicle of ISRO. The objective of developing GSLV Mk III are listed below.

  1. To launch heavier communication satellites
  2. To launch heavier multi-purpose satellites
  3. Future Interplanetary exploration
  4. To launch future crewed missions i.e. to carry humans to space.

GSLV Mk III – Launches till 2020

So far GSLV Mk III has had 4 successful launches. The list is given below.

  1. CARE (Crew Module Atmospheric Re-entry Mission)
  2. GSAT – 19 Mission, launched in June 2017.
  3. GSAT – 29  Mission, launched in November 2018.
  4. Chandrayaan 2 Mission – It was a mission to the Moon. It was launched in 2019.

All the above launches were from Satish Dhawan Space Centre (SHAR), Sriharikota, located in Nellore district of Andhra Pradesh.

GSLV Mk III – Payload Capacity

  1. It is designed to carry satellites weighing 4 tons into Geosynchronous Transfer Orbit (GTO).
  2. It can carry satellites weighing 10 tons to Low Earth Orbit (LEO) – at an altitude of 600 kms.

GSLV Mk III – Engines & Boosters

  1. 2 Vikas Engines powers the Core Stage. These engines are developed by Liquid Propulsion Systems Centre of ISRO.
  2. S 200, 2 Solid Boosters are used to give the GSLV Mk III a huge thrust. S 200 was developed at Vikram Sarabhai Space Centre (VSSC), Trivandrum.
  3. The Upper stage is known as the cryogenic stage (C-25). This stage is powered by CE-20, the largest Cryogenic Engine built by ISRO. Cryogenic engines are a very complex technology that has been developed by very few countries.

GSLV Mk III – UPSC Notes:- Download PDF Here

Relevant Links

UPSC Mains General Studies Paper-III Strategy, Syllabus & Structure Topic-Wise General Studies Paper – 3 Questions for UPSC Mains
Previous Years Science & Technology Questions in UPSC Mains General Studies Paper – 3 Science & Technology Notes For UPSC – Download PDF (Free)

 

Relevant Links

IRNSS-NAVIC: Navigation with Indian Constellation Aditya-L1 Mission: 1st Indian Mission to Study Sun
Cartosat 3 – Highest Resolution Satellite Launched by PSLV C-47 Mars Orbiter Mission (MOM) – 1st Interplanetary Space Mission of India
Gaganyaan Mission – ISRO’s Space Mission. Details, Timeline, Astronauts Reusable Launch Vehicle – Technology Demonstrator (RLV-TD) – Specifications, Cost and Mission
BHUVAN – Geo Spatial Data (ISRO) Facts about the Chandrayaan-2 Mission: Objectives, Significance and Highlights
Indian Space Research Organisation [ISRO] – Milestones, Objectives List of Indian Satellites – (1975 – 2020)
ISRO’s Project NETRA – An Early Warning System in Space NISAR – NASA-ISRO Synthetic Aperture Radar Mission
Astrosat – India’s Dedicated Satellite for Astronomy EOS – 01 Satellite | India’s Earth Observing Satellite by ISRO

 

Comments

Leave a Comment

Your Mobile number and Email id will not be published.

*

*